Dorade received a prior refit in 2007-08. The link below has the photo journal for this refit. The refit was undertaken by Edgar Cato, the then owner. Work included mizzen mast repair, removal of the interior, re-framing (35 pairs of frames), new floor timbers, 10 new planks per side and many other details. For a complete collection of photos for this project, See: http://www.buzzardsbayyachtservices.com/design7photos.htm