Dorade
  • ABOUT
    • Team Dorade
    • Specs
    • Contact
  • HISTORY
    • Past Campaigns
  • RESULTS
  • MEDIA
    • Press
    • Photos
    • Video
  • BLOG
  • ABOUT
    • Team Dorade
    • Specs
    • Contact
  • HISTORY
    • Past Campaigns
  • RESULTS
  • MEDIA
    • Press
    • Photos
    • Video
  • BLOG
May 19, 2011  |  By Dorade Team

Mast head

Peter mocks up the main masthead for halyard placement analysis. A beautiful three halyardsystem as designed by Greg will be fitted for the head sails.
Previous StoryCabin house winch placement
Next StoryRunning rigging

Dorade
Web Design by risingT