Good Morning Matt,
Boat back at LMI and full wrap up of projects underway. A quick list of what is current.
- Measuring and building lifeline wires this AM.
- Deck repair ready for caulking with TDS.
- Spreader down lights being installed. These are nice brass fittings to capture the LED lamps.
- Radar bracket mount in the works. Will drill and tap for the mount today.
- Track cars and deck eye screws in final polish.
- Fire boy bottles mounted and being wired. This involves a couple of displays in the cockpit which are being placed in the instrument footwells so the disappear when panels are in place.
- Sails finishing up at North.
- Measuring for tuppareware bins to stack under cockpit for organized storage.
- Setting up to protect the boat for passage on DYT. Deck covering, cap rail covering, messenger halyards etc.
- New internals on the way no charge from Meissner for electric winch.
- Final bits of plumbing and wiring wrap up today.
- All paint and varnish projects wrap up for instal on boat tomorrow.
- Tank calibration for fuel today. Water tanks calibrated.
- Watermaker tested and working.
- Cabin top painted
- Hatch garage non skid painted
- Ding on topsides painted, needs buffing.
- Spare tiller and swim ladder being mounted in fore peak.
- Leather glued on to new boom crutch. All leather work now complete.
- Custom screw bolts for life raft cradle in the works today.
- Will spend some time aloft today smoothing out spots on the sail track where separate sections but each other. This will help smooth out the hoist.
- All custom dish racks complete and in varnish production.
- Book shelf and galley fiddles installed.
- New tiller being varnished.
- Cabin house does not leak anymore. Not a drop from all the rain this weekend.
- Stove to tank connection happening right now.
- Custom water tight cap for charlie noble thru house fitting being built right now.
- Inventory of gear underway along with sorting to expedite re loading onto boat.
- All un wanted items off to consignment. Should not need any additional storage outside of the trailer this winter.
- Toilet seat painted post modification for sink clearance.
- Life jackets and ditch bag delivered today.
- WiFi extender just arrived and will be wired up today.
- Galley and nav tie in eyes installed for race regs.
- Genoa track numbering system being thought thru for stamping later today.
Will be a busy week, but I think we have a good handle on the list.