May 19, 2011 | By Dorade Team Mock up of the new bow pulpit and head stay fittings Mock up of bow pulpit and head stay fittings. Mock up of new stem head fitting. Line for A-Sail tack line through fair lead in the fitting. Alternate view shows bow rail connection point. Actual rail will be continuous small diameter bronze.