Dorade Team


May 19, 2011

Peter mocks up the main masthead for halyard placement analysis. A beautiful three halyardsystem as designed by Greg will be fitted for the head sails.

May 19, 2011

  Cabin top winch placement was discussed with Greg and Brad. We looked at moving the main sheet winch outboard (see previous photo) to clear a dodger when in "offshore mode". Also found the old Meissner runner winches that were replaced by LVJ self tailiers. We are considering using these slightly larger winches (port) in […]

May 19, 2011

  First coat of paint goes on the bulwarks and covering boards.

May 19, 2011

Fitting the new rudder shoe.

May 19, 2011

  The "girdle" and the "widowmaker" will be omitted from the new spar.  

May 19, 2011

  Nels mocks up a new holding tank.  

May 19, 2011

  New inner forestay fittings for interior tie rod.  

May 19, 2011

  Phip examines Merriman toggles.

May 19, 2011

  Gosnel painting out the forepeak.

May 16, 2011

Latest photos of the current refit at Dorade's winter home at the Loughborough yard.

March 11, 2011

This is the new stem piece. The final splining and faring have begun. The new stem head fitting will allow for Dorade to be sailed in her 1931 configuration or a similar configuration to her

March 9, 2011

March 9, 2011

March 7, 2011