June 30, 2011

Bro has completed a teak platform for the under cockpit storage area.  The platform serves to divide the space into two levels of storage.  Items that get less frequent use can be nested into the frames and floors below the platform.  Upstairs allows room for keeping things that need to be close at hand.  The […]

June 30, 2011

Jens has built some lovely wedges to support the mizzen mast at the deck partners.  Two laminated blocks are carved to fit the deck cut out on their outer profile and the shape of the spar on their inner.  Jens chose to craft these in teak.  You can see the old spar butt laying on […]

June 27, 2011

A rough outline of DORADE'S interior has been installed upstairs.  The idea being to facilitate stowage planning, and interior re construction.  The bits going back on board can be laid out where they belong.  We can make sure all the pieces of the puzzle are accounted for without interrupting work  inside the boat.  This little […]

June 27, 2011

Bro has been working hard on Matt's bunk. Aft of the nav station, tucked along the starboard side of the cockpit will be the owners quarter berth. Matt has made it clear that he can fit comfortably behind the hanging knee, which supports the aft end of the cabin house. Amenities will include a privacy […]

June 22, 2011

We have been working with Phip at Rig Pro on testing various materials and thicknesses for the new mast hardware. Sample tangs are pulled to 8000 pounds stopping every 2000 pounds to measure hole elongation. All recorded data has been forwarded to Greg for evaluation. Preliminary results look to using phosphur bronze as the material […]

June 22, 2011

The keel joint had been packed with epoxy and was cracked it's whole length. Epoxy has been reefed out and the lead to wood joint has been properly addressed to prevent leaking and biological intrusion. Chet built a router jig to accurately recut the seam between the lead and the oak keelson. The jig had […]

June 22, 2011

Follow LUCIE in her bid for the world championship 6 meter title at www.Lucie.org

June 21, 2011

A full mock up of the galley and nav area has been completed in order to get a feel for the layout of and flow between the port and starboard components of the aft cabin. The joiner work will be completed off site and installed fully varnished.  Joe is keeping a keen eye on weight savings. Additional […]

June 2, 2011

The lower part of the forward starboard lockers has been fitted to accommodate Dorade'sbatteries. Twin lithium ion batteries will sit on top of the platform. Ample tie down and covering will be fitted once the batteries themselves arrive. After much deliberation, Joe has found a location that is both low enough and forward enough for these […]

June 2, 2011

  Rope on the left is double braid poly by New England Ropes and is a sample of what Doradecurrently sails with. Rope on the right is poly spec from Nova Braid and is being considered for new halyards on the new spars.  A third option is available from Gleistein Ropes in Europe.  We are looking […]

May 19, 2011

Peter mocks up the main masthead for halyard placement analysis. A beautiful three halyardsystem as designed by Greg will be fitted for the head sails.

May 19, 2011

  Cabin top winch placement was discussed with Greg and Brad. We looked at moving the main sheet winch outboard (see previous photo) to clear a dodger when in "offshore mode". Also found the old Meissner runner winches that were replaced by LVJ self tailiers. We are considering using these slightly larger winches (port) in […]

May 19, 2011

  First coat of paint goes on the bulwarks and covering boards.

May 19, 2011

Fitting the new rudder shoe.